Saturday, January 28, 2012

Recent Project

New detached garage designed to replace existing garage for a single family residence. 
The client needed a two-car garage with small workshop and an exercise room. Within the small footprint we provided a flexible garage and workshop space with the exercise space in the attic.  The space is heated using a heat pump system. 

Saturday, November 19, 2011

Pretty Brow Art & Spa now open


Construction is now complete on the Pretty Brow Art & Spa.  The spa is located in the Westland Mall Shopping Mall, Westland MI. 
The spa uses a threading technique to shape eyebrow and facial hair.  They also provide facial treatment and massage. 

Tuesday, August 23, 2011

Are you eligible for home improvement aid?

Citizens Bank is offering to reimburse Detroit homeowners in select areas for half of the costs -- up to $10,000 -- to improve the exterior of their homes.

• Homeowners must live in one of these neighborhoods: North End, Boston-Edison, Virginia Park, Hubbard Farms, Palmer Woods, Sherwood Forest, University District, East English Village, North Rosedale or Green Acres.

• Home must be insured and up-to-date on taxes.

To apply, go to http://myhome.citizensbanking.com/index.htm .

From Detroit Free Press Full Article here.

Saturday, June 18, 2011

Crutcher Studio Rated on Thumbtack.com

Crutcher Studio was rated among the top architects in the Detroit area by the web site thumbtack.com.  Follow this link to see the rating: Architects - Detroit, MI  
Architects, Detroit, MI

Friday, June 17, 2011

Messiah Church Parking Lot Expansion

Accessory Parking lot for Existing Church.  Project will provide an additional 20 parking spaces for the church.  A decorative metal fence and landscape will improve the appearance of the corner.  Scheduled to be completed fall 2011.

Wednesday, February 23, 2011

Are you planning a restaurant or food based business in Michigan?

Here is some information you should know.

Sunday, February 6, 2011

Architect's Sketch over Coffee February 2011

The sketch discussion went well.  There were a lot of good questions concerning construction materials, processes and somethings to consider before you decide to renovate.
Item that came up during the discussion:
-The comparison between using metal studs or wood studs for construction. 
-Structural Insulated Panels
-Zoning requirements and yard setbacks.
-Baement or crawl space considerations
-Planning for barrier free accessibility.
Bring your project ideas for an open discussion with me on these and any other building or design related questions you may have.
Next month's discussion (March 11, 2011) will be on the first steps in planning your project.
Email me (crutcherk@crutcherstudio.com) to RSVP.

Sunday, January 30, 2011

The Raw Cafe Now open!!










The Raw date is now open for business. Located at Woodward and Willis in Detroit, the Raw Cafe features a raw, vegan menu.
Check out the menu!

Tuesday, January 25, 2011

Architect's Sketch over Coffee



What is the first step in planning to build an addition to your home?
Who do you speak to first when you want to build?
How do I control the cost of my building project?
Bring your project ideas for an open discussion with me on these and any other building or design related questions you may have. Email me (crutcherk@crutcherstudio.com) to RSVP.

Saturday, October 23, 2010

New Restaurant Opening soon

From Crutcher Studio News

The Raw Cafe located be opening soon. Located in the former C-Pop Gallery at Woodward and Willis in Detroit the restaurant will offer a raw, vegan menu.
Crutcher Studio provided architectural services to help the owners transform the former art gallery into the first raw, vegan restaurant in the area.
Check out the Raw Cafe website for menu and opening date.

Wednesday, July 7, 2010

Builder and Contractor List

Sunday, June 13, 2010

Concept for a House in Kenya



I am currently developing a concept for a house in Kenya. The house will have 6 sleeping rooms and will be located on a hill overlooking Lake Victoria.

Tuesday, June 8, 2010

Recent Project

Greater Cutz Hair Salon, Madison Heights, MI
Opening soon!!

Wednesday, February 3, 2010

High School Architecture Exploration Program







I have an opportunity to hold an Architecture Exploration Program for Detroit area High School Students. This program is designed to introduce high school students to careers in the Architecture, Design and Creative Industries. Students will engage in a real world architectural design problem and utilize the current technological tools used by industry to develop high demand, high wage, 21st Century Skills.

Deadline extended

For an application or for more information click here.

Monday, December 14, 2009

Painting and Drawing

I have been exploring painting and drawing in between architectural commissions. Some of my pieces are on my website.

Thursday, November 26, 2009

Meals on Wheels

Wednesday my daughters Girls Scout Troop and I helped the Christian Tabernacle Church’s Meals on Wheels 2009 volunteer campaign pack meals for seniors.
We helped pack Thanks Giving meals for 5500 people.

Help support Detroit Meals on Wheels.

Monday, October 26, 2009

I NEED YOUR HELP!

October 28, 2009 I'm going behind bars for "GOOD"

PLEASE HELP BAIL ME OUT!


Your donation is my key to freedom! Be proud of the fact that together we're providing help and hope to kids and adults served by MDA in our community.

MDA is the nonprofit health agency dedicated to curing muscular dystrophy, ALS and related diseases by funding worldwide research. The Association also provides comprehensive health care and support services, advocacy and education

What Your Dollars Will Buy
Contribution Service(s)
$85 One minute of research
$100 One support group session
$150 One physical, occupational or respiratory therapy consultation
$200 Professional fees related to initial diagnostic work-up at an MDA clinic
$500 Assists one person for one year with the repair of a wheelchair or leg braces
$800 Sends one child to MDA summer camp
$2,000 Assists one person with the purchase of a wheelchair, leg braces or communication device

Please donate here

Friday, September 11, 2009

Michigan Building Permits

Every community in Michigan has some requirements for the construction or renovation of buildings. One of the first steps to take when planning any construction project (after selecting your architect) is to check with the local building department.
I have begun to compile a list of links to Building and Safety Department websites in Michigan. The contact numbers are on most of the websites. Some communities also have a building permit application available for download.
Feel free to bookmark the site for future reference.

Friday, September 4, 2009

Residential Architect Magazine

I was quoted in the Residential Architect Magazine article paid in full - with their clients caught in the credit vise, architects learn the fine art of bill collection.

Source: residential architect Magazine
Publication date: July 1, 2009

By cheryl weber, leed ap

Full article here


Monday, August 31, 2009

What are Architectural Services?

The process we follow for the Design and Construction of projects involve several steps. Typically, projects go through the following six steps or phases. However, on some simple projects, several of these steps may be combined; on other more complex types there may be additional steps.

Step 1: Deciding What to Build
This first stage, called programming, is probably the most valuable time you will spend with us, your architect. It is at this time we discuss the requirements for your building: how many rooms, what function the structure will have, who will use it and how. It is also the time when you begin to test the fit between what you want, what you need, and what you can afford to spend.
Step 2: Rough Sketches
Once we have defined what is to be built, we will then do a series of rough sketches, known as schematic designs. These sketches will show you the general arrangement of rooms and of the site. If you have difficulty understanding the sketches (many people do), ask and we can explain the ideas. Depending on the project and budget, we can also make models of the design to help better visualize it.
Step 3: Refining the Design
This step, called design development, is when we prepare more detailed drawings to illustrate other aspects of the proposed design. The floor plans will show all the rooms in the correct size and shape. Outline specifications will be prepared listing the major materials and room finishes.
Step 4: Preparing Construction Documents
At this point, we prepare construction documents, the detailed drawings and specifications which the contractor will use to establish actual construction cost and to build the project.
Step 5: Hiring the Contractor
There are a number of ways to select a contractor. We can make recommendations, or if you already have someone you want to work with, you might send the construction documents to him or her and negotiate fees and costs. Or you may wish to choose among several contractors you've asked to submit bids on the job. We will discuss the pros and cons of these methods with you to help you decide what will work best for you.
Step 6: Construction
This final step is often the most anxiety-producing part of the whole process. Up until now, your project has been confined to intense discussion, planning, and two-dimensional renderings. When construction begins, your project moves from an abstraction to a physical reality.
Ready to start?
If you are ready to start I would like the opportunity to discuss various issues relating to your current or future design needs. Please contact Crutcher Studio, Inc for a project consultation.

Our full description of services.

(Adapted from the AIA publication "A Beginners Guide to Architectural Services")

Friday, August 28, 2009

Farmington Schools Facilities Study Committee

Kenneth Crutcher has been selected to participate on the Farmington Schools Facilities Study Committee.
The committee's responsibilities are to:
-Develop a plan and time line for maximizing the use of the District’s facilities with an emphasis on maintaining high quality instructional programs and financial efficiency.
-Establish specific criteria to develop a recommendation for consideration by the Board of Education.
-Determine whether preschool classes should be in centers and/or elementary schools.

The Committee will present the recommendation and rationale to the Board of Education on January 26, 2010.

Wednesday, July 22, 2009

Open House for The Arts League Of Michigan Virgil H. Carr Cultural Arts Center

July 21, 2009

Crutcher Studio, Inc. assisted The Harris Design Group with the interior design for the new home for The Arts League of Michigan Virgil H. Carr Cultural Arts Center. The Arts League of Michigan is a center that develops, promotes, presents and preserves the African and African American cultural arts traditions within our multicultural community.

The development of the Virgil H. Carr Cultural Arts Center is the next step in the evolution of the organization and moves to establish it and The Arts League of Michigan as major participants in the cultural life of our community and the nation. Named in honor of Virgil H. Carr, past Chairman of the Board of Trustees of the Arts League of Michigan, this facility will be recognized as the premier center for African and African American cultural arts programs and activities in the nation.

The Carr Center is located in The Harmonie Club, located at 311 E. Grand River. Constructed in 1895, the building and its subsequent club, known as the Harmonie Club was originated by the Harmonie Society, a musical society of German immigrants. Designed in classical Beaux Arts style, the building is four stories embellished by appealing stone work, and carefully designed curving windows, all reminiscent of the best in urban architecture of the late Victorian age.

Friday, July 17, 2009

Pewabic Pottery


I have been invited to join the Pewabic Society, Inc. Board of Trustees.
The Pewabic Society, Inc. founded in 1981, is a private, 501(c)(3) non-profit membership organization dedicated to the preservation and promotion of the Pottery as a ceramic arts learning center, museum/archive and gallery, as well as its cultural and community outreach programs.

The Society ensures that Pewabic continues to serve the nation as a unique common ground where artists and the public share interests and ideas about ceramic arts.

Consider becoming a member

Sunday, June 28, 2009

My Daughters

My youngest daughter had her first communion This Sunday. I have to share this their first performance as a string duet. Candice on the Bass and Caitlin on Violin.

Wednesday, June 24, 2009

Masonry Deck for a Residence



I have just completed the design for a deck using brick and concrete. The owner wanted the low maintenance and durability of masonry and concrete. The structure of the deck will be structural steel and enclosed with brick. The floor of the deck will be stamped and stained concrete on a metal deck. A gazebo on the deck will have a metal roof.

Build-Up Detroit/Detroit Sustainability Center

Kenneth Crutcher has been invited to co-chair of the Build-Up Detroit/Detroit Sustainability Center Committee for the Southeast Michigan Sustainable Business Forum. The Detroit Sustainability Center (DSC) is an element of the Build Up Detroit (BUD) Program developed by Detroiters Working for Environmental Justice (DWEJ). The vision of this program is to establish the groundwork for a green social and economic development paradigm for Detroit that will provide safe and healthy housing, good paying jobs and the restoration of the environment through best practices in the use of land.
Through the development of the DSC, Detroiters Working for Environmental Justice has high hopes for raising the profile of sustainable technologies and launching an institution for the city that prepares local citizens for employment in emerging job fields.

Thursday, May 14, 2009

Hip Hop Meets Architecture

Kenneth Crutcher is mentioned in the article "Hip Hop Meets Architecture in the Work of U-M Detroit Design Center Prof" By: Dennis Archambault. The article is about the recent book by Dr. Craig Wilkins, "The Aesthetics of Equity," published last year by the University of Minnesota Press.

Wednesday, March 25, 2009

Interior Renovation: Reconfigure a master bathroom


Renovation of a Master Bathroom and closet.
The challenge was to provide a steam shower and increase the usable closet space.
The proposed renovation takes advantage of the existing plumbing locations to create a more open plan for the bathroom and provides an increase in closet space.

Saturday, December 20, 2008

Ten Ways to Get More from Your Architect Than You Paid For

I have in the past had clients ask for ways to reduce the fees associated with a project. Here is a great article that presents some great ways to get the most out of the services of an architect.

AIA Article

Kenneth Crutcher Elected toNOMA Detroit Board

Kenneth Crutcher has been elected to the position of President of the Detroit Chapter of the National Organization of Minority Architects. His one year term begins in January 2009.

Friday, November 21, 2008

Studio Sketch Service

As part of our Studio Sketch service, you will receive an architectural sketch of your project. The sketch will include a floor plan and exterior or interior elevations, custom-designed for your project. The sketches are sent via e-mail and hard copies are sent via regular mail. You will also receive a free construction cost estimate and follow-up consultation.

With our Studio Sketch service, I will create a conceptual plan of your project before you begin the work. The Studio Sketch is a good place to start because it is the same service a traditional architect would provide to you during an initial consultation. But our Studio Sketch service is more affordable and more convenient.

Use Studio Sketch if you need:
A basic design of your project. If you're thinking about a remodel or addition to your home or building and you're not sure where to begin or how much it will cost, let our Studio Sketch Design service guide you. Send us a photo of the area of your house you want to renovate and we'll create a custom design sketch of your project and provide a cost estimate for construction.

Sunday, September 28, 2008

Recent Project

Crutcher Studio has completed design work for RSMS Motors Car Dealership Facility.
Located on a small triangular site on the west side of Detroit, the building will house office and repair facility for a used auto dealership.

http://www.crutcherstudio.com/new_page_4.htm

Recent Project


Crutcher Studio has completed the design for an addition to a residence in Inkster, Michigan. The addition to this small house is designed to provide additionalliving space to care for a disabled relative in the home and to allow the family to interact in the common areas of the house.
The remodeling of the existing kitchen will allow barrier free space for the family to eat together.

http://www.crutcherstudio.com/taylor-hibbert.htm

Monday, September 22, 2008

Crutcher Studio, Inc. joins The 1%, a program of Public Architecture

10 firms join The 1% in July; AIA issues "Pro Bono Guidelines" draft
Thursday, August 14, 2008
Public Architecture extends a welcome to the 10 firms that joined The 1% in July. Hailing from diverse locales across the country, these firms have become part of the network of architects providing quality design services to those who normally do not have access to them.

http://www.theonepercent.org/About/News.htm?nid=46

Tuesday, September 16, 2008

Kenneth Crutcher appointed to the Farmington, MI Planning Commission

At their special meeting of July 18, 2008, the Farmington City Council appointed Kenneth Crutcher as a Commissoner on the Planning Commission. The three-year term expires June 30, 2011.

Sunday, September 14, 2008

Welcome

Welcome to the Crutcher Studio News Blog.